Gas HT switch in the 400kV Marx generator (LW4 - 14/05/2002).
One of the 400kV Marx generators under assembly (LW4 - 14/05/2002).
View of the bottom flange
of the gas chamber, with the laser chamber anode
in position (LW4 - 14/05/2002).
View of the bottom flange
of the gas chamber, with the laser chamber anode
in position (LW4 - 14/05/2002).
Evgeny and Sasha assembling the gas circuit (LW4 - 14/05/2002).
Laser chamber pressure measurement (LW3 - 8/05/2002).
To more photos... | LIS home page