The electron gun situated on the rail (LW3 - 8/05/2002).
The electron gun situated on the rail (LW3 - 8/05/2002).
One of the gas switches (~50kV) (LW3 - 8/05/2002).
One of the gas switches (~50kV) (LW3 - 8/05/2002).
400kV Marx generators being assembled, e-gun in final position (LW3 - 8/05/2002).
The gas recirculator piping - not yet finished (LW2 - 30/04/2002).
To more photos... | LIS home page