Test assembly of the cable tubing (LW7 - 3/06/2002).
Yuri Satov filling the N2 trap of the regenerator pump. (LW7 - 3/06/2002).
General view - e-gun in place, regenerator in place, Marx Banks almost fully assembled (LW7 - 3/06/2002).
The regenerator installed in its final position (LW6 - 23/05/2002).
Looking inside the regenerator (LW6 - 23/05/2002).
To more photos... | LIS home page