SLHC-PP - Critical Components for the Injector Upgrade
The Superconducting Proton Linac Source and Low Level RF systems
|
|
Deliverables and Milestones
D7.1.1 Finite element thermal study of the Linac 4 design source at the final duty factor
(report).
M7.1 List of required improvements for the design of the high duty factor plasma generator to function at a high duty factor
(report).
|
WP7 General |
Summary of WP7 at the 2009 sLHC-PP General Meeting, R Scrivens.
|
WP7.1 Plasma Generator |
Presentations at the 1st Kick off meeting, 8/9 April 2008
|
WP7.2 Low Level RF |
Presentations at the 1st Kick off meeting, 8/9 April 2008
|