EU Logo SLHC-PP - Critical Components for the Injector Upgrade
The Superconducting Proton Linac Source and Low Level RF systems
  Deliverables and Milestones
D7.1.1 Finite element thermal study of the Linac 4 design source at the final duty factor (report).
M7.1 List of required improvements for the design of the high duty factor plasma generator to function at a high duty factor (report).

WP7 General Summary of WP7 at the 2009 sLHC-PP General Meeting, R Scrivens.
 
WP7.1 Plasma Generator Presentations at the 1st Kick off meeting, 8/9 April 2008
The SPL parameters, source and low-level RF, F Gerigk  
   
Increasing the ISIS Ion Source Duty Cycle- A Thermal Study, D Faircloth  
From the Linac4 H- source towards a source for the SPL, D Kuchler  
   
SLHC preparation WP7 – Critical Injector R&D, a Summary, R Scrivens  
   
17/06/2009
PG Production KO meeting summary
 
   
WP7.2 Low Level RF Presentations at the 1st Kick off meeting, 8/9 April 2008
The SPL parameters, source and low-level RF, F Gerigk  
LLRF deliverables - where to go from here, W Hofle  
Linac4 Low Level RF, P Baudrenghien  
LHC RF Tuner Control System, J Molendijk  
SC Cavities for TRASCO (beta=0.5), P Pierini